One real job, start to finish.
This is what you get back. A real tender set from a museum fitout: the quote, the counted plan, the questions, the symbol key and the parts list - exactly as the robot produced them.
Real drawing, real robot output. These counts have not been checked by a person yet - that's your job in the review step. Logos, names and the title block are cropped out.
Upload the set. See the price first.
We read every page, sort out which ones are plans to count, and quote you before anything is counted.
26 sheets × $15. Pay only if you're happy with it.
From here we follow one of those sheets: E301, the lower ground floor power & comms layout.
Every fitting boxed on the plan.
Each yellow box is one thing the robot counted. Red boxes are ones its own self-check thinks it missed - flagged, not counted, never quietly guessed.
Not sure? It asks. You tap.
Anything the robot isn't sure of becomes one quick question, with the choices taken straight off the consultant's legend. Try it - this one is real.
- The choices are the consultant's own legend symbols, cut straight from the legend sheet.
- One answer covers every box of that symbol - you don't click 22 times.
- Skip anything you'd rather check on the plan. Nothing is guessed for you.
- On this sheet there are 6 of these to tick off. Answer them, then download.
Every icon, next to its legend name.
So you can see at a glance what the robot took each symbol to be. Icons are cut from the plan itself.










Totals you can price from.
Every line says how it was found and whether it still needs a look. Download it as Excel when you're done.
| Qty | Part (legend name) | Status |
|---|---|---|
| 22 | Single phase IP56 power outlet, 20AEssential / non-essential / UPS are drawn alike - set by circuit | Counted |
| 14 | Double 10A GPOEssential / non-essential / UPS are drawn alike - set by circuit | Counted |
| 8 | LED wall washer, track mounted [D1.1] | Needs a check |
| 7 | Three phase permanent connection c/w full current isolator | Counted |
| 7 | Dual-gang 8P8C (RJ45) communications outlet | Needs a check |
| 6 | Single 10A GPOEssential / non-essential / UPS are drawn alike - set by circuit | Counted |
| 3 | Distribution board | Counted |
| 2 | Floor box containing ECD FBIP4SQF [FB3]Found by its printed tag FB3 | Counted |
| 1 | Wireless access pointFound by its printed tag CM WAP | Needs a check |
| 1 | Control panelFound by its printed tag | Needs a check |
| 4 | Possibly missed: three phase permanent connection | Flagged - not counted |
| 1 | Possibly missed: double 10A GPO | Flagged - not counted |
| 1 | Possibly missed: single phase permanent connection | Flagged - not counted |
| 71 | counted on E301 · 6 more flagged for you to check | |
The sample parts list for this sheet. On a real job it covers every sheet, with counts per sheet. Runs like conduit and cable tray aren't on it - take those off as usual.
Try it on your drawings.
Upload the PDF and see your price before you pay. Can't count it? You're not charged.
Get my quote